Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Power transformer specifications
Capacity: 30-5000 kva
Rated voltage high voltage side: 36 kv; 11kV;
Rated voltage of low voltage side: 0.4kV;
Oil immersed, dry, amorphous alloy, combined transformer, pre-installed transformer, and so on factory test requirements. (According to the maximum capacity and maximum current design, output current by 200A, maximum output voltage by 4kV design)
S/N | Product Name | Specification | Qty | Remark | ||
Part 1:Main control bench and power supply | ||||||
01 | Transformer comprehensive performance test bench | 1 set | ||||
High voltage test auxiliary control cabinet | 1 set | |||||
Three-phase induction voltage regulator | 200kVA/10-650V | 1 set | ||||
Part 2: transformer characteristic test | ||||||
02 | Transformer no-load and load characteristic tester | 1 set | ||||
Standard current transformer | 200-5A/1A 0.1 level, working voltage:4kV | 3 sets | ||||
Standard voltage transformer | 4kV,1.5kV/0.1kV 0.1 level, working voltage:4kV | 3 sets | ||||
Test intermediate transformer | 160kVA/1.5kV,3kV | 1 set | ||||
High voltage capacitor compensation cabinet | 510kvar/3.6kV | 1 set | ||||
Part 3: induction withstand voltage (double frequency withstand voltage) test | ||||||
03 | Three phase multiple frequency generator set | 60kVA/20-800V, Input | 1 set | |||
Part 4:Conventional meter | ||||||
04 | Insulation resistance tester | 5000V, | 1 set | |||
Transformer ratio & Dc resistance tester | ZC-208, | 1 set | ||||
Part 5: power frequency withstand voltage test | ||||||
05 | Ac test transformer | 30kVA/100kV, | 1 set | |||
Digital high voltage meter | 100kV | 1 set | ||||
Part 6: Temperature Rise Test | ||||||
06 | Double Channel Temperature rise DC resistance tester |
1 set | ||||
Multi-channel temperature recorder |
1 set | |||||
Part 7: Connecting cables and accessories for field equipment |
||||||
07 | Control cable between main control console and auxiliary control cabinet | 1 set | ||||
Test wire and clamp between auxiliary control cabinet and test object | 1 set | |||||
Input and output connections between the auxiliary control cabinet and the voltage regulator | 1 set | |||||
Connecting line between auxiliary control cabinet and multiplier generator set | 1 set | |||||
Connection line between auxiliary control cabinet and test transformer | 1 set | |||||
Part 8: Spare parts | ||||||
08 | High current testing clamps | 3 pcs | ||||
Test alarm lights and bells | 1 set | |||||
Fuse for instrument | 1 set | |||||
Printer paper for instrument | 1 set |
1. Is it all right to make customer's own brand name?
Yes, we can provide OEM service.
2. Are you a manufactuer or trading company?
We area leading manufacturer in China.
3. Can you do the design for us?
We can provice personalized customization service.
4. When Can I get the Price?
We usually quote within 6hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
5. What should I do if I do not know how to use?
Dear customer, please do not worry, manual user will be sent together, you can also contact us with more technical support and online guidance.
6. How can I choose the suitable one?
Dear customer, please tell us your detailed requirements by mail or online, we will recommend the suitable one as your request.
7. Could you please tell me the Warranty period of your products?
Our warranty period is one year free and lifelong maintenance, and if the product we sell is damaged (if not man-made damage), in the first year, we will send free parts for free replacement.
Over the warranty, the maintenance is paid service.
8. Do you have Technical Backup to all customers from different customers?
To be surely, our technical support is always available and quick response.
We are manufacture of so much on site testing experience and understand how to deal with your problems. Moreover, our engineer can go to your country to support if need.